Buronga Substation

PROJECT DETAILS

Our Client: BMD

End Client: TransGrid

Completed: 2019

Equipment: 20T Franna Crane, 40T Crane, 36m Boom Pump, 22m Line Pump, Bobcat, 14 Excavator

Scope of work

The Substation had two separate portions and the scope combined consisted of the construction of 140 Bored piles and pile caps with cast-in hold-down bolts, three Syncon Slabs, two Transformer Bund slabs, two Spill Oil Containment Tanks, three Lube Oil Bund slabs, and other seven slabs to support various types of apparatus (Dead Tank circuit Breaker, Pump Skid, Fan coolers, Diesel generators, Auxiliary and Earth Transformers).

Construction of 100m of in-situ cable trench, to connect for trafficable and non-trafficable areas.