South Morang Terminal Station

PROJECT DETAILS

Our Client: Ausnet Services

End Client: Ausnet Services

Completed: 2022

Equipment: 3T Excavator, 1.7T Excavator, Skid Steer Loader, 5T Tip Truck, 16T Excavator, 45T Mobile Crane, Rotary Drilling Rig, 20T Franna Crane

Scope of work

This scope included bored pile and pad footing construction for the new double switched Bay G which involved the installation of conduits and other associated civil works.

Fabrication and assembly of 26m high galvanised steel 220kV yard rack structure.

Removal of nine 23m timber temporary line support poles.