Scope of work
Bell Preston was the construction of 2no. 58 span bridges side by side. The bridges elevated the rail removing 4 crossings, Oakover Road, Bell Street, Cramer Street and Murray Road on the Mernda Line
- FRP 80 Monolithic Piers
- FRP 4 abutments
- FRP L-Beam Stitches
- Permanent works Abutment piles
- Prefabricating crosshead and pier cages
- Station platform retention inclusive 60+ piles of 450-600mm in diameter
- Supply and install of temporary platform steel structures.