Scope of work
CIG Scope for Camp Rd included FRP of the 30 x 20 metre Bridge Deck and Abutments, installation of precast performance barriers, two in-situ approach slabs and a shared user footpath.
A 22 x 6 x 3m sump tank was constructed as part of the drainage works for the rail track, including pump, valve and meter cabinet slabs, and a precast panel roof structure.
All elements were successfully delivered to the client within a 2 week rail occupation, with 24hrs continuous works for the duration.