Keon Park Level Crossing Removal

PROJECT DETAILS

Our Client: John Holland Group

End Client: North Western Program Alliance

Equipment: 20T Franna, 25T Franna, 60T Crawler Crane, 55t Rough Terrain Crane, 100T Crawler Crane

Scope of work

The scope of works includes the following tasks for the construction of two road bridges over an existing railway line.

Excavation for bridge foundations.
Pile breakback operations.
Construction of 30 in-situ crosshead & piers.
Construction of 4 abutments.
Construction of 31 spans of U-Trough Stitches.
Construction of 1 Station Edge Beam.
Precast and install of abutment facia panels.
Precast and install of 108 L-Wall panels.
In situ stitch of L-Wall panels

These tasks collectively form the comprehensive scope of works for the construction of the road bridges, ensuring compliance with VicRoads standards and specifications