Scope of work
Civil Infrastructure Group carried out construction of as part of the Kiamal Substation
The installation of 222 bored piles, ranging from 350 to 1350mm in diameter
Construction of 70 pile caps
Fabrication and installation of 11 Precast Fire Walls (up to 16T)
FRP of 55 lin.m of cable trenches
Excavation and FRP of a 95m2 concrete slab