Loy Yang Power Station

PROJECT DETAILS

Our Client: Zinfra

End Client: AusNet Services

Completed: 2018-2019

Equipment: 8T Excavator, 5T Excavator, 1.7T Excavator, Posi-Track Loader, Tip Truck

Scope of work

Bored pile and pad footing construction for the modification of 500kV circuits for new double switched bays, including installation of conduits and other associated civil works. 164 new or modified footings involved in the works.

Construction of 180m cable trench including excavation, placement of precast culverts and backfill, as well as poured in-situ sections to tie into existing trenches or change alignment.