Equipment: 4T Telehandler, 15-25T Franna Cranes, 2x60T Road Gantry Cranes, 28-52m Concrete Pumps, 60T Formwork Platforms, Post Tensioning equipment, 100T – 500T Hydraulic Jacks, Concrete Early Age Loggers, 50Kva Generators, Power Screeds, Fabricated Bridge Access platforms, CIG designed Suspended Falsework Systems

Scope of work

The scope was broken up into Bridge works and Southern Approach works. Bridge works included; fabrication of 60t formwork platforms and casting of concrete crossheads between existing Bridge Piers, Multi Strand Post Tensioning works of the piers, installation 2T Pot Bearings, 80T Steel Girder Installation, Precast Bridge Translfoor panels, Reinforcement Install, Concrete placement Precast Parapets install, Parapet Stitch Joining and Approach Slabs.

The Southern Approach included; Elevated Formwork, Multi strand Post Tensioning works, installation of Elastomeric Bearing Pads, Pile Breakback, Reinforcement Install, Concrete placement, Precast Parapets install, Parapet Stitch Joining and Approach Slabs.