Mt Derrimut Road Level Crossing Removal

PROJECT DETAILS

Our Client: McConnell Dowell Constructors

End Client: Western Program Alliance

Equipment: 25T Franna, 55T Crane, 5T Telehandler, Concrete Pumps, EWP's

Scope of work

The scope of works included the construction of a Railway Line Bridge and Through link Bridge, ensuring full compliance with all VicRoads standard specifications. The tasks involved during the completion of the project were:

  • Form, fix reinforcement and pour/finish 30 columns and headstocks.
  • Form, fix reinforcement and pour/finish 4 abutments.
  • Form, fix reinforcement and pour Steel girder slabs and ballast walls.
  • Pile breakback operations
  • Design and supply all temporary works.

Additionally, the scope included excavations as required, construction of approach slabs, restraint block, and pedestals, as well as supply labour for supervision for the installation of U-Through.