Warun Ponds Duplication Project

PROJECT DETAILS

Our Client: McConnell Dowell Constructors

End Client: Regional Rail Revival

Equipment: 25T Franna, 5T Telehandler, Concrete Pumps, EWP's

Scope of work

The scope of works included the construction of a Railway Line Bridge and Through link Bridge, ensuring full compliance with all VicRoads standard specifications. The tasks involved during the completion of the project were:

  • Form, fix reinforcement and pour/finish 6 columns and headstocks.
  • Form, fix reinforcement and pour/finish 2 abutments.
  • Form, fix reinforcement and pour/finish 8 pile caps.
  • Form, fix reinforcement and pour Blade walls, deflection walls, approach slabs.
  • Pile breakback operations
  • Design and supply all temporary works.
  • Precast Crossheads and beams.

Additionally, the scope included excavations as required, construction of restraint block, and pedestals, as well as supply labour for supervision for the installation of U-Through