Westgate Distributor Stage 1

PROJECT DETAILS

Our Client: Fulton Hogan

End Client: VicRoads

Completed: 2016

Equipment: 20T Franna Crane, 43m Concrete Pump, Scissor Lifts, Generators, Power Screeds, Telehandler, Bridge Inspection Unit, Knuckle Boom 12m Barge, Pre-Fabricated Access Platforms, Pontoons, 35t Excavator, Stressing jacks

Scope of work

The widening of Shepperds Bridge (Footscray Road) over the Maribyrnong. Design and Installation of Ductile Iron Piles with 35t Excavator. Post- Tensioning of Existing Piers.

The construction of concrete piers and abutments for a steel shared user path. Temporary works for all aspects of project.