Scope of work
The widening of Shepperds Bridge (Footscray Road) over the Maribyrnong. Design and Installation of Ductile Iron Piles with 35t Excavator. Post- Tensioning of Existing Piers.
The construction of concrete piers and abutments for a steel shared user path. Temporary works for all aspects of project.